Building handover for developers: from settlement to a running building

Handover is when a new building gets its first records, its first manager and its first systems. Get it right and the building starts life organised. Get it wrong and the building manager spends the first year chasing documents.

Developers including Lendlease, Mirvac, Meriton and Frasers appear on the MYBOS developers page.

Example handover

New 120-apartment building

From practical completion to day-to-day management

On track
  1. Asset register loaded

    Plant, lifts and services with warranties attached

  2. Documents filed

    Manuals, certificates and plans in the building library

  3. Keys registered

    Building and apartment keys recorded in the key register

  4. Inspections done

    Pre-settlement inspections logged with photos

  5. Defects tracked

    Each item logged, assigned and followed to close-out

  6. Residents onboarded

    Registration portal opened for new owners and tenants

Everything the developer hands over lands in the system the manager runs from.

What should a building handover checklist include?

Everything the building manager will need to run the building without calling the developer: assets, documents, keys, defects, contractors and a plan for residents moving in.

AreaWhat to hand overWhy it matters
AssetsA register of plant, lifts and services with models, locations and warrantiesMaintenance and warranty claims start from this list
DocumentsManuals, certificates, as-built plans and service contractsThe manager needs them the first time something fails
Keys and accessA full key register for building and apartment keysLost keys and unknown copies are a security problem
InspectionsPre-settlement inspection results with photosA baseline for every later defect discussion
DefectsA list of open items with who is fixing whatOwners will ask, and the answers need to be on record
ContractorsWho installed and services each systemWarranty work often has to go back to the installer
Maintenance scheduleRecurring servicing set up from day oneWarranties can depend on servicing being done

Why is handover the moment to get systems right?

Because it is the only time all of the building's information is in one place, with the people who know it still on site.

A few months after settlement, the builder has moved on, the site team has dispersed and documents are spread across emails and folders. If the asset register, keys and defects are captured in a system at handover, the building manager inherits a working building rather than a filing problem.

It is also when the building's software gets chosen. Developers who set the building up on a platform before handover give the incoming manager and committee a head start.

How does MYBOS support handover?

The records captured at handover become the records the building runs on.

  • Asset register with warranties, manuals and the installing contractor on each asset
  • Building library for plans, certificates and manuals, searchable later
  • Digital key register so every key is recorded and signed in and out
  • Inspections with photos captured on site
  • Defect tracking through cases and work orders, followed to close-out
  • Resident registration so new owners and tenants can register their details

See how MYBOS works with developers on the MYBOS developers page.

What happens after handover?

The defects liability period starts, and the building has to prove its systems work.

The first two years of a new building bring a steady flow of defects, warranty claims and resident questions. Tracking them properly protects the owners' position and keeps the builder accountable. We cover that stage in detail in our guide to the defects liability period, and defect tracking itself on our building defect management software page.

This page is general information for developers and building managers. It is not legal advice.

“It is a complete toolkit to run our building affairs as soon as it is commissioned.”

Tim Campbell, Project Director, Lendlease

Rated 4.3 out of 5 on Capterra, GetApp and Software Advice, and trusted by over 200 organisations.

Large residential portfolios on MYBOS

Set up your next building on MYBOS

Tell us about your development and handover timeline. We'll show you how MYBOS captures the records the building manager will run on.

If you go ahead, our Australian team helps set up your buildings and bring your records across, and your managers get free training through the MYBOS Training Academy.

Book your demo

No obligation. We'll be in touch to find a time that suits.

Prefer to talk? Email sales@mybos.com or call +61 2 8378 1096.

Building handover questions, answered

Who is the handover checklist for?

This checklist is written for developers and the building managers taking over new buildings. It covers the information and systems the building needs to run. It is not a purchaser's inspection checklist for an individual apartment.

When should a building be set up in MYBOS?

Ideally before handover, while the developer's team still has the asset details, documents and contractor information to hand. Setting it up then means the incoming manager starts with complete records.

Can the asset register be uploaded in bulk?

Yes. For new buildings, the MYBOS team can help with a batch upload of assets rather than entering them one at a time, so a large register can be loaded quickly.

How are keys handled at handover?

MYBOS has a digital key register. Building and apartment keys are recorded with their type and location, and keys can be signed out to contractors with a due-back time, so there is a clear record of who has each key.

How does handover connect to defect management?

Pre-settlement inspection results and open defects become cases and work orders in MYBOS. Each one can be assigned, tracked and closed with photos, which gives owners and the committee a clear record through the defects liability period.